CCTV Tower at Logistics Hub

Case Study Background

Southern Shield is a collaborative safety forum that consists of Network Rail Infrastructure Projects Southern Region and its principal contractors.

The forum was set up in response to a tragic accident at Saxilby in 2012 when Scott Dobson was killed in a collision with an oncoming train. 

Following this, Southern Shield now examines processes, plant, design and culture to see where contractors can improve to eliminate accidents and incidents, whilst ensuring that everyone working in the IP Southern region gets Home Safe Every Day.

Their aims are as follows:

  • Prevent accidents or incidents
  • Support and enhance the safety rules that are in place
  • Lay down the minimum safety requirements in the southern region so that safety is never sacrificed for commercial advantage

The Challenge - Workforce Safety

The Southern Shield Safety Group, which is part of Network Rail, took measures to improve safety standards by implementing the Workforce Protection System. In this, redeployable, remotely accessible CCTV were identified as a key health and safety tool.

Network Rail were keen to establish a central monitoring position within the new route control centre at the Cotton Exchange in London, allowing contractors working on infrastructure projects on behalf of Network Rail to monitor the systems via their own viewing platforms.

As a major infrastructure partner of Network Rail, Osborne Rail offered their full support to Southern Shield Safety and resolved to use CCTV monitoring as part of their health and safety procedures on all future projects undertaken on behalf of Network Rail.

The ambition of Southern Shield is to ensure everyone gets home safely everyday.

Energy Case Study - BAM Nutall
Rail Approved CCTV at Station

The Solution - Network Rail Approved Rapid Deployment CCTV

Osborne Rail contracted WCCTV, given the company's existing status as Network Rail's key technology partner, to provide 30 Redeployable 4G IR Speed Domes and three of our Network Rail Type Approved Towers.

By using our systems and Rapid Deployment CCTV Towers, they provide live transmission of video and alarms from a site using cellular connectivity, allowing remote operators to view images live from the site.

When incidents occur, the central control centre is notified where an operator will escalate a response as deemed most appropriate to the nominated contractor for corrective action.

The systems retain up to 4 weeks of continuous recording, ensuring the mandatory recording period of 48 - 72 hours is met.

The Result

“As Technology Improvement Manager for Osborne Rail, I was introduced to WCCTV as Network Rail’s technology partner, providing remote viewing systems for the Southern Shields Workforce Protection Scheme. As the principal contractor for the Wessex route and in partnership with Network Rail, we purchased several WCCTV 4G systems to deploy on projects and major works in 2015.

The underlying driver behind the project is to ensure the safety of the workforce; WCCTV’s technology allows for live video feeds to be accessed from any location, enhancing our existing safety practices. I’ve found the systems easy to deploy and use, and I’ve been delighted with the ongoing support I’ve received from WCCTV.”

Osborne Rail

Ready to find out how Rapid Deployment CCTV can work for your company? Get in touch today at 0808 189 8611 or request a call back

CCTV Tower at Commercial Property

Contact us

Get in touch for more information

A more flexible and convenient solution to your security and surveillance challenges is just a step away. Get in touch with our security experts and let us know how we can help.