View navigation

View navigation

CCTV Tower Installed at Train Station

Case Studies

Network Rail / Babcock International - Great North Rail Project

Learn More

Case Study Background

Network Rail's GNRP is a vast programme of improvements to transform train travel for customers in the North.

It will enable 2,000 extra services each week and allow 40,000 more passengers to travel each day. More trains with more seats, running more quickly and more reliably. Train customers are the immediate beneficiaries of improved transport links (or connectivity) between towns and cities in the North.

As new opportunities, including jobs, are created, and businesses get access to a greater pool of talent, local communities and the wider regional economy will feel the knock-on benefits of GNRP. This will boost growth regionally and nationally.

The Project - Great North Rail

Babcock International contracted WCCTV as a specialist provider of wireless video solutions.

WCCTV provided a complete range of rapid deployment video solutions that delivered multiple benefits, including:

  • Project overview

  • Site Security

  • Workforce protection

  • Time Lapse Video

WCCTV also provided Network Rail trackside workers with Body Worn Video cameras for a range of applications, including: 

  • Safety and Security

  • Track and Structural Inspections

  • Mobile Operations Management

  • Health and Safety

  • Remote Project Overview

  • Recording Activities for Training

  • Review of Procedures and Practices

WCCTV Body Cameras Worn by Rail Workers

WCCTV also provided Network Rail with five Network Rail Type Approved Tower - the only Rapid Deployment CCTV Tower with PADS approval for trackside deployment.

It is non-conductive, easy to install, and its redeployable design means clients can quickly move it to a new location as requirements change.

The Network Rail Tower integrates wireless mobile technology to transmit live and recorded video and alarms, a market-leading PTZ camera with infrared imaging and 360-degree pan, tilt and 36x zoom, audio speakers to enable a remote challenge to occur, and a removable hard drive (up to 4TB) for local storage.

It features multiple powering options for complete flexibility, including:

  • Mains – 110/240v

  • Eco long-run battery - allowing generator shutdown at nights/weekends

  • Methanol Fuel cell - autonomous power for up to 8 weeks

  • Solar and Wind Power

Untitled - 2023-10-25T084559.253

WCCTV were also tasked to provide time lapse video production from five locations to encapsulate the transformation work in an engaging video format.

WCCTV has a strong pedigree, working with blue-chip organisations such as Balfour Beatty, Skanska, BAM, VolkerFitzpatrick, NMC and AMCO - capturing some amazing projects from start to finish. 

As well as providing a stunning, fully-edited finished product, WCCTV also provides you with access to a secure portal where you view live progress images from the site and even create your own video clips.

The Result

The infographic below, released by the S&C Alliance, breaks down the many successes on a project that Network Rail delivered safely and on time.

WCCTV Case Study - Network Rail - Great North Rail Project

Ready to find out how Rapid Deployment CCTV can work for your company? Get in touch today at 0800 470 4630 or request a call back

Related content

Solar CCTV Tower - Wide Thumb

The Benefits of Rapid Deployment CCTV for Construction Site Security

Installing rapid deployment CCTV cameras for construction site security, either as an alternative or complement to manned guards, offers many benefits.

Contact us

Get in touch for more information

A more flexible and convenient solution to your security and surveillance challenges is just a step away. Get in touch with our security experts and let us know how we can help.